Stormwater management plans, OSD calculations and pit-and-pipe design across the Sydney Basin — including Fairfield, Cumberland, Canterbury-Bankstown, Inner West and Sutherland LGAs. Built to the specific council policy, not generic.
Council-Specific Compliance
Sydney has 33 councils and at least 33 different stormwater policies. A standard "NSW stormwater design" template won't survive Fairfield's policy on permissible site discharge, won't pass Cumberland's water-quality MUSIC requirement, and won't meet Canterbury-Bankstown's freeboard rules. Here's where generic designs fail.
Each council sets its own permissible site discharge rate — sometimes per LGA, sometimes per catchment, sometimes per pre-development scenario. Apply the wrong PSD and your OSD volume is wrong, your orifice is wrong, and the design fails review.
Most Sydney councils now require a MUSIC water-quality model demonstrating compliance with their stormwater quality targets (typically 80% TSS, 45% TP, 45% TN reductions). A storage-and-overflow design with no treatment train is an automatic refusal in most LGAs.
An OSD design that meets PSD at the site boundary still fails if the receiving council pit isn't sized for the flow. We verify the downstream system can take the design discharge — and if it can't, we negotiate with council before submission rather than after refusal.
Council-specific stormwater design, modelling and documentation — from small residential subdivisions to multi-hectare commercial sites.
Comprehensive SMPs for DA and CC submissions — site analysis, hydrological modelling, hydraulic design, water quality treatment train and erosion/sediment control, all to the relevant council policy.
OSD storage sizing per council PSD rules, tank/basin design, orifice sizing, overflow weir design and discharge structure detailing — for residential, commercial and industrial sites.
Hydraulic design of stormwater pits and pipes using DRAINS / EPA-SWMM modelling — from kerb inlets to outlet structures, with HGL and EGL verification.
MUSIC water-quality modelling, treatment train design (gross pollutant traps, bioretention, rain gardens, wetlands) and verification against council quality targets.
Council-specific stormwater documentation packages — built for the exact LGA policy, including any required pre-DA stormwater meeting representation.
Independent peer review of stormwater documentation prepared by others — for developers, certifiers and councils who want a second pair of eyes before signing off.
From the site survey to council approval — a transparent council-specific design process.
Tell us about the project. We'll review the documentation, define a fixed-fee scope of works and turn around a quote — usually within 24 hours.
Our engineers carry out the design, calculation, inspection or assessment to the relevant Australian Standards, NCC provisions and project-specific requirements.
We deliver clear, signed engineering documentation — drawings, specifications, compliance certificates or reports — built to satisfy certifiers, councils, insurers and the courts.
Construction support, certifier RFIs, site inspections, post-issue revisions — we stay engaged through to project completion, not just until the document is issued.
Council-specific stormwater documentation delivered across the Sydney Basin.
SMP · Fairfield LGA
A 2,400 m² industrial development in Fairfield required full Stormwater Management Plan to council's specific policy — including 80/45/45 quality targets, on-site detention sized to Fairfield's PSD curve, and pre-DA consultation with council engineering. We delivered the SMP, MUSIC model and OSD design as a single integrated package.
Residential · Cumberland
A 12-lot subdivision in Cumberland LGA needed combined quality and quantity stormwater design with bioretention raingardens at each lot. We sized the bioretention to MUSIC targets, designed the pit and pipe trunk system, and integrated the result into the architectural landscape design.
OSD · Liverpool LGA
A 5,800 m² commercial warehouse in Liverpool LGA required underground OSD due to no available surface area. We sized a precast concrete OSD tank, designed the orifice plate to council PSD, and detailed the access manhole and trash screen requirements for ongoing maintenance.
Peer Review · Liverpool LGA
A large developer's stormwater package was submitted to a Sydney council showing PSD compliance but raised questions about the receiving pit capacity. The council engaged us for an independent peer review of the hydraulic modelling, MUSIC analysis and downstream verification.
Council-policy literacy for developers, certifiers and architects.
Common property scopes, capital works planning, defect investigations and compliance certification for Class 2 buildings.
Design declarations, Performance Solutions, certification packages and staged inspections — built to satisfy the certifier on the first submission.
Specialist engineering input on facade, waterproofing and structural elements where Deemed-to-Satisfy provisions don't apply.
Practical engineering advice on renovations, defects and pre-purchase risk assessments — translated out of jargon.
Most Sydney metropolitan councils — Fairfield, Cumberland, Canterbury-Bankstown, Liverpool, Sutherland, Inner West, Hills, Strathfield, Burwood, Bayside, Georges River, Parramatta, Hornsby and others. Each has different PSD rules, water-quality targets and freeboard requirements; we build to the actual LGA policy, not a generic template.
Yes. MUSIC (and the newer MUSIC-X) is a standard part of nearly every council DA submission now. We build calibrated source nodes for the site land use, design the treatment train (raingardens, bioretention, GPT) and report against council's stormwater quality targets — typically 80% TSS / 45% TP / 45% TN reductions.
For a typical residential dual-occupancy or small commercial site, the SMP including OSD sizing and MUSIC model is $2,500–$4,500 fixed fee. Larger sites (subdivisions, mixed-use, multi-hectare commercial) range from $6k to $20k depending on complexity, hydraulic modelling depth and council pre-DA requirements.
Yes. For larger projects we routinely attend pre-DA meetings with council engineering staff — confirming PSD interpretation, downstream pit capacity, treatment train acceptance and any specific council requirements before the design is locked in. It's the cheapest way to avoid a refusal.
DRAINS for pit-and-pipe hydraulic modelling, MUSIC / MUSIC-X for water quality, AutoCAD Civil 3D for drainage layout, and EPA-SWMM for complex catchments where dual-drainage analysis is needed. Most councils accept any of these — we use the one that fits the LGA's preference.
Yes. Rainwater tank sizing for BASIX water-target compliance is included in our residential stormwater packages — including roof catchment analysis, tank volume calculation and plumbing reuse strategy. Often combined with the OSD design to share storage volume where the council policy allows.
Yes — we work across the Hunter, Illawarra, Central Coast and Gold Coast SEQ. Each region has its own council policies; we'll confirm at the quote stage whether a specific LGA falls within our active scope. Travel and on-site time outside the Sydney Basin is quoted separately.
Yes. We carry out independent peer reviews for councils, certifiers, developers, owners corporations and lawyers — auditing the hydraulic calculations, MUSIC modelling, council policy compliance and downstream impact. Useful before a contested DA, or after an approved-but-now-failing system.